The equipment includes the TTIR lathe specially designed
by our R&D&I department for underground tramway rails.
ICC max. 18.5 kA/1s

PATF-PC
The equipment PATF-PC is composed of:

  • 1 PC aluminium alloy clamps with screw tighten for cylindrical conductors with diameter 35 max.

  • 1 copper cables with PVC insulation of 50 mm2 section and 7 m of length.

  • 1 TTIR milling earthing lathe.

  • 1 nylon bags to store and transport the equipment.


SEE PRODUCT >
 

PATF-PDC
The equipment PATF-PDC is composed of:

  • 1 PDC aluminium alloy clamps with screw tighten and bayonet for cylindrical conductors with diameter between 12 and 27 mm.

  • 1 copper cables with PVC insulation of 50 mm2 section and 7 m of length.

  • 1 TTIR milling earthing lathe.

  • 1 nylon bags to store and transport the equipment


SEE PRODUCT >

FIVE SEVERAL REASONS TO PROTECT PERSONNEL WORKING ON CIRCUITS BY INSTALLING TEMPORARY EARTHING:
 

1. Induced voltage from adjacent live lines.
2. Lightning strikes anywhere in the circuit.
3. Switchgear failure or human error.
4. Accidental contact with adjacent lines.
5. Backfeed from incorrectly connected solar panels or generators.

 

Any of these factors can cause a circuit to be re-energised and most operators in the railway sector therefore consider that there is always a potential risk and set strict rules for temporary earthing at work.

BEING WELL PROTECTED DEPENDS ON YOU
 
 
Facebook Twitter LinkedIn WhatsApp
We use our own and third-party cookies to improve our services and technical reasons, to improve your browsing experience, to store your preferences and, optionally, to show you advertising related to your preferences by analyzing your browsing habits. We have included some configuration options that allow you to tell us exactly which cookies you prefer and which you don't. Press ACCEPT to consent to all cookies. Press SETTINGS to decide the options you prefer. To obtain more information about our cookies, access our Cookies Policy here: More information
Accept Decline Settings