telf.info@sofamel.esexport@sofamel.es

Earthing and short-circuit equipments

Mod. ECBT-MPUE Mod. ECBT-MPUBTH
Low voltage electric panels Low voltage electric panels
ModECBT_MPUE


ModECBT_MPUBTH
Phase earthing and short-circuit equipment for low voltage electric panels.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The MPUE clamps can be fixed on bare cylindrical conductors, fixed points or flat bars. Each one has its own fixed handle.

Phase earthing and short-circuit equipment for low voltage electric panels.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The MPUBT/H clamp for low voltage is perfect to be fixed on flat bars.

PDF PDF
Mod. ECBT-PAT/CC Mod. PATF-MPU
Low voltage electric panels Unipolar earthing equipment

ModECBT_PAT_CC


ModPATF_MPU
Phase earthing and short-circuit equipment for low voltage electric panels.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

It has an insulated lever suitable for extraction of blade fuses with M-10 connection.

Single phase earthing equipment. It has a MPU/B or MPU/H clamp which allows the earthing connection of the lines for repair operations.
PDF PDF
Mod. ELBT-CC Mod. ELBT-PAT/CC
Low voltage overhead lines Low voltage overhead lines

ModELBT_CC


ModELBT_PAT_CC
Phase short-circuit equipment for low voltage overhead lines.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The ELBT clamp is placed by pressing a bare conductor by spring. The clamp mechanism grants a permanent and persistent contact.

Phase earthing and short-circuit equipment for low voltage overhead lines.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The ELBT clamp is placed by pressing a bare conductor by spring. The clamps mechanism grants a permanent and persistent contact.

PDF PDF
Mod. PATL-MPUB Mod. PATL-MPLB
Medium voltage overhead lines – Screw clamps Medium voltage overhead lines – Screw clamps
ModPATL_MPUB


ModPATL_MPLB
Phase earthing and short-circuit equipment for medium voltage overhead lines.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The MPU clamp is fixed on bare conductors by screw-tightening.This equipment has got a MPUP clamp (carrier) which facilitates to put up the three clamps at the same time, reducing installation time considerably.

In accordance with IEC 61230 standard.

Phase earthing and short-circuit equipment for medium voltage overhead lines. The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The MPL clamp is fixed on bare conductors by screw-tightening. This equipment has got a MPUP clamp (carrier) which facilitates to put up the three clamps at the same time, reducing installation time considerably.

In accordance with IEC 61230 standard.

PDF PDF
Mod. PATL-MC Mod. PATL-PCA25
Medium voltage overhead lines – Automatic clamps Medium voltage overhead lines – Automatic clamps with final mechanical fixing
ModPATL_MC


ModPATL_PCA25
Phase earthing and short-circuit equipment for medium voltage overhead lines.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The MC clamp is fixed on bare conductors by pressure and removed by an operating hook. The three clamps can be put up at the same time thanks to the dispenser head, facilitating operator’s work.

In accordance with IEC 61230 standard.

Phase earthing and short-circuit equipment for medium voltage overhead lines. The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The three clamps can be put up at the same time thanks to the dispenser head, facilitating operator’s work. The new PCA-25 clamp grants an easy and secure installation.

In accordance with IEC 61230 standard.

PDF PDF
Mod. PATC-5014H Mod. PATC-PP15
Medium voltage substations – Driver clamps Medium voltage substations – Bus bar clamps
ModPATC5014H


ModPATC5014H
Phase earthing and short-circuit equipment for medium voltage substations.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The 5014 clamp is perfect for difficult access areas. The clamp can be adjusted depending on the inclination required thanks to its multi-directional head system.

In accordance with IEC 61230 standard.

Phase earthing and short-circuit equipment for medium voltage substations.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The PP-15 clamp is suitable for bus bar buided in horitzontal or vertical directions.

In accordance with IEC 61230 standard

PDF PDF
Mod. PATC-MPU Mod. PATCPF-MPU
Medium voltage substations – Screw clamps Medium voltage substations – Screw clamps
ModPATC5014H


ModPATCPF-MPU
Phase earthing and short-circuit equipment for medium voltage substations.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The MPU clamp is fixed on bare cylindrical conductors, fixed points flat bars, and bending bus-bars by screw tightening.

In accordance with IEC 61230 standard.

Phase earthing and short-circuit equipment for medium voltage substations. The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

The MPU clamp is fixed on bare cylindrical conductors, fixed points or flat bars by screw tightening.

In accordance with IEC 61230 standard.

PDF PDF
Mod. PATL-TML Mod. PATC-TMC
High voltage overhead lines High voltage substations
ModPATL_TML


ModPATC_TMC
Phase earthing and short-circuit equipment for high voltage overhead lines.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

In accordance with IEC 61230 standard.

Phase earthing and short-circuit equipment for high voltage substations.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

In accordance with IEC 61230 standard.

PDF PDF
Mod. PAT-MPL
High voltage overhead lines and substations
ModPAT-MPL
Phase earthing and short-circuit equipment for high voltage overhead lines.

The main aim for its installation is the operator’s protection against an accidental commissioning or possible return voltage during repair operations.

In accordance with IEC 61230 standard.

PDF
SPARE PARTS INFORMATION
MC MPUP MPUB
Code 671120 Code 671116 Code 671115
MC


MPUP


MPUB
PDF PDF PDF
MPUH 5014H MPUBT
Code 671110 Code 671100 Code 659001P
MPUH


5014H


MPUBT
PDF PDF PDF
MPLP PP15 PCA-25
Code 671156 Code 671165 Code 671170
MPLP


PP15


PCA-25
PDF PDF PDF
MPL TML TMC
Code 671155 Code 670100P Code 675100P
MPL


TML


TMC
PDF PDF PDF
PPMC MPUE EMP
Code 671125 Code 671112 Code 659001E
PPMC


MPUE


EMP
PDF PDF PDF
TT38L TT38A TT50
Code 671145 Code 671140 Code 671150
TT38L


TT38A


TT50
PDF PDF PDF